SENSORRAIL IIIE ADRL3TRK SERIES 8200-0593-02, REV. A
INSTALLATION GUIDE
4 of 34
Parts Supplied
Note: The number of parts supplied depends on
the length of the rail.
Rail section package, which includes:
- 2.5m (8.2ft) straight rail sections
- 2.5m (8.2ft) PVC holders
- Stirrups, 1 per rail section
- Jointing plates, 4 per rail section
- Screws for jointing plates.
Rail accessories package, which includes:
- End covers (2) with attachment hardware
- Springs for service stop blocks (2)
- Stop screws (2)
- Nylon service blocks for mechanical stops
and trolley retrieval (2)
- Optical stop strip (1 roll)
Light reduction kit
- 30cm (11.8in) section w/top hat cover (2).
Trolley package
- Camera trolley with 2.4GHz RF transceiver,
CPU, SpeedDome Ultra dome camera, and
motor
- PowerRail 90–240Vac (50/60Hz) to 27Vdc
power supply with RS-422 to RS-232
connections, 2.4GHz receiver, PAL.
Cowling package
Copper tracks package
- Wheels to hold copper tracks
- Support structure for wheels
- Service trolley
- Steering wheel to retrieve copper tracks for
servicing.
Note: The tool used to install copper tracks is
not supplied with the system.
Parts to be Purchased Separately
M8 threaded rods and related hardware, and
ceiling connection assemblies
3.3mm (1/8in) cable (as needed), steel
galvanized 7x19 strands, minimum working load
limit 680kg (1500 lbs)
8mm (5/16in) galvanized eyebolts, 317kg
(700 lbs) minimum working load limit
U-bolt clamps and wire thimbles for 3.3mm
(1/8in) cable
9.6mm (3/8in) minimum size diameter jaw & jaw
turnbuckles, 544kg (1200 lbs) break strength,
362kg (800 lbs) minimum working load limit
SensorNet-to-RS422 code converter for VM16,
VM32 and MegaPower LT video controllers, if
used. The AD1024 matrix switcher requires a
2083 converter.
Tools and Equipment Required
Proper lift equipment (scissor lift with extended
work platform is recommended)
Hilti PR-15 rotating laser leveling device
60cm (2ft) bubble level
String line
Battery-powered drill, ½-inch
Metric screwdrivers and Allen wrenches
M13 open wrench
0.1–5mm feeler gauge set
Common hand tools, such hammers, cutters,
and pliers
Copper track installation/retrieval tool
Torque wrench
Soldering iron
Laptop with AD SensorRail Control application
installed and a serial port or USB-to-serial port
Protective gloves (surgical or cotton type)
Protective eyewear
Plastic card similar to a credit card
Ruler
Cleaning pads and tissues (for fingerprint
removal upon completion).